CSE 5314/7314 (Spring 2025): Homework #2

Prof. Jeff Tian (tian@engr.smu.edu)

Assignment

  1. Choose one of the bottom-up or top-down model construction procedures for PT (partition test) to perform one of the following:
  2. Try to run at least a few of the test cases you constructed. In addition, compare and contrast the above test case construction activities (and possibly the test execution too) in such formal/systematic testing with what you did in hw#1.
  3. Enhance your testing model for the previous problem to build a Musa OP to support UBST. In particular, pay attention to and describe the information sources, participants and additional data collection needed, granularity and practicality of the OP constructed.

Due Date

2/18/25


Prepared by Jeff Tian (tian@engr.smu.edu).
Initially posted: 2/12/25. Last update: 2/12/25.

Back to CSE 5314/7314 Webpage