CSE 5314/7314 (Fall 2026): Homework #2

Prof. Jeff Tian (tian@engr.smu.edu)

Assignment

  1. You may choose to continue with the system you did informal testing in hw#1 or pick a different software/system. Choose one of the bottom-up or top-down model construction procedures for PT (partition test) to perform one of the following:
  2. Try to run at least a few of the test cases you constructed. In addition, compare and contrast the above test case construction activities (and possibly the test execution too) in such formal/systematic testing with what you did in hw#1.
  3. Enhance your testing model for the previous problem to build a Musa OP to support UBST. In particular, pay attention to and describe the information sources, participants and additional data collection needed, granularity and practicality of the OP constructed.
  4. Discuss the similarities and differences between informal testing you did for hw#1 before and the formal/systematic testing (at least the modeling part) for hw#2.

Due Date

9/29/26


Prepared by Jeff Tian (tian@engr.smu.edu).
Initially posted: 9/16/26. Last update: 9/16/26.

Back to CSE 5314/7314 Webpage